Case Study – Tundish Tile Cylinder

Case Study – Tundish Tile Cylinder

The Brief

Overhaul of 2 Tundish Wrecker Tile Cylinder approximately 17tonnes each from a steel plant in the UK

Items were identified as requiring overhaul as part of a major plant maintenance campaign. Site visits were arranged to view the items, assess scope of work and prepare cost and timescale schedule.

Results

Items were collected from site for strip, inspect & condition report at our Bradford facility.  Successfully overhauled back to original design specification and returned to site within schedule.

Download Case Study Here